Hosaf Shahjibazar Rental Power Plant
Sector: Natural Gas • Location: Bangladesh
Source: World Bank Group
Energy Prima Limited (EPL), subsidiary of Hosaf Group, operated the 50MW Shahjibazar rental power plant which became operational in November 2008.
The project consisted of 29 gas engines. Contract length was 3 years.
Total cost was US$11.8 million, based on US$600k per MW, for 3 years at 10% interest. The project was still operational in December 2012.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Energy Prima Limited (EPL), subsidiary of Hosaf Group, operated the 50MW Shahjibazar rental power plant which became operational in November 2008. The project consisted of 29 gas engines. Contract length was 3 years. Total cost was US$11.8 million, based on US$600k per MW, for 3 years at 10% interest. The project was still operational in December 2012. http://www.hosafgroup.com/epl.html http://www.energyprima.com/project.php |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
