Hoshangabad-Khandwa Road
Sector: Road • Location: India
Source: World Bank Group
MSK Infrastructure and Toll Bridge Private Limited was awarded a 15 year build-operate-transfer (BOT) contract for the 185.6 km Hoshangabad-Harda-Khandwa Road by the State of Madhya Pradesh in May of 2002. There had been an urgent need to strengthen and upgrade the region’s roads due to a considerable increase in traffic and commercial activities. Total cost of the road was estimated at Rs. 81
- Status
- Prospective
- Sector
- Road, Cable car, Bridge, Telecommunications, Government, Automotive, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Hoshangabad-Khandwa Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | MSK Infrastructure and Toll Bridge Private Limited was awarded a 15 year build-operate-transfer (BOT) contract for the 185.6 km Hoshangabad-Harda-Khandwa Road by the State of Madhya Pradesh in May of 2002. There had been an urgent need to strengthen and upgrade the region’s roads due to a considerable increase in traffic and commercial activities. Total cost of the road was estimated at Rs. 81 crore (approx. US$18.5 million), 51 crore of which was given in the form of a government grant/subsidy. The project was part of the second phase of a larger, three phase state-wide road development program that aimed at constructing 15 new road corridors totaling 2155 km throughout Madhya Pradesh. The state had planned total expenditures of around Rs. 1,000 crore (approx. US$225 million) for the program with Rs. 500 crore of that amount raised through the issuance of infrastructure bonds that would be used to subsidize the private operators. Madhya Pradesh was the first Indian state to implement a road development program on such a large scale with private participation. Under the “Bond BOT” scheme, investment was made by the private developer who was then allowed to collect tolls on the road for a 15 year term, which was inclusive of the construction period. To make the projects more attractive, the government provided grants/subsidies to the private sector company on a competitive bidding basis. For each project, three privately outsourced consultants were appointed: a technical consultant, a financial consultant and a supervision and quality control consultant. Financial closure for the Hoshangabad-Harda-Khandwa Road had been achieved through SBI (State Bank of India) Investment, which provided over Rs. 44 crore. As of December 2003, five tranches of subsidy had been released by the government. It was projected that toll collection on first section would be started in early 2004. http://www.mpbridgecorporation.com/index.htm |
Original sector | Transport |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Cable car, Bridge, Telecommunications, Government, Automotive, Commercial |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
