Hospital Project Old Hampden Ave Lincoln to Clarkson Rep
Sector: Water Supply and Storage • Location: Englewood, Colorado, United States of America
Source: Dodge USA
Replacement of existing deteriorated storm water pipes along Old Hampden Ave with larger ones with adequate capacity. A bottleneck exists in this segment that must be replaced to allow the system to operate at full capacity in this area. This funding is for construction of the last portion of the project started in 2024.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Replacement of existing deteriorated storm water pipes along Old Hampden Ave with larger ones with adequate capacity. A bottleneck exists in this segment that must be replaced to allow the system to operate at full capacity in this area. This funding is for construction of the last portion of the project started in 2024. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
