logo

Hot-In-Place Asphalt Paving

Sector: Government • Location: Thunder Bay, Ontario, Canada

Source: Dodge

Project
Bidding

This project includes approximately 32,660 square metres of asphalt pavement will be resurfaced utilizing hot-in-place recycling. Miscellaneous repairs to curb and gutter, catch basins, catch basin leads, and maintenance holes are also part of the work. An alternate bid method comprised of asphalt milling and conventional paving will also be accepted in lieu of hot-in-place recycling.

Status
Prospective
Sector
Government, Road, Waste Processing and Treatment, Power Transmission, Commercial, Water Supply and Storage, Car parking, Manufacturing (Industrial), Automotive, Power Generation (CCGT)
Location
Thunder Bay, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Hot-In-Place Asphalt Paving

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hot-In-Place Asphalt Paving” is an infrastructure initiative in the Government sector, located in Thunder Bay, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project includes approximately 32,660 square metres of asphalt pavement will be resurfaced utilizing hot-in-place recycling. Miscellaneous repairs to curb and gutter, catch basins, catch basin leads, and maintenance holes are also part of the work. An alternate bid method comprised of asphalt milling and conventional paving will also be accepted in lieu of hot-in-place recycling.

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Thunder Bay

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Road, Waste Processing and Treatment, Power Transmission, Commercial, Water Supply and Storage, Car parking, Manufacturing (Industrial), Automotive, Power Generation (CCGT)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project