Hot-Mix Asphalt Pavement
Sector: Water Supply and Storage • Location: Stillman Valley, Illinois, United States of America
Source: Dodge USA
DESCRIPTION OF WORK Location: S. Valley Drive and W. 2nd Street Project Length: 1,600' Proposed Improvement: Mill existing Hot-Mix Asphalt pavement of variable thickness and aggregate base a total of three inches (3") and replace with three inches (3") of Hot-Mix Asphalt Pavement, removal and replacement of concrete curb and gutter, manhole adjustment and inlet reconstruction. Project may include
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
- Location
- Stillman Valley, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hot-Mix Asphalt Pavement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF WORK Location: S. Valley Drive and W. 2nd Street Project Length: 1,600' Proposed Improvement: Mill existing Hot-Mix Asphalt pavement of variable thickness and aggregate base a total of three inches (3") and replace with three inches (3") of Hot-Mix Asphalt Pavement, removal and replacement of concrete curb and gutter, manhole adjustment and inlet reconstruction. Project may include undercutting of existing subgrade to be identified in the field for replacement with aggregate ba... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Stillman Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
