logo
ProjectBidding

Hot Springs WWTP Facility Blower Controls Upgrades

Bidding · Montana · Last reported Aug 2024

Source: Dodge USA

The project consists of completing upgrades to the controls and instrumentation for the aeration blowers at the Hot Springs wastewater treatment facility. Work includes the following major items: Demolition of existing motor control center (MCC). Installation of a new MCC, electrical panels, conduit, conductors, analog pressure gauge, mass flow meters, and variable frequency drives (VFDs).

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial
Location
Hot Springs, Montana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Hot Springs WWTP Facility Blower Controls Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hot Springs WWTP Facility Blower Controls Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Hot Springs, Montana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of completing upgrades to the controls and instrumentation for the aeration blowers at the Hot Springs wastewater treatment facility. Work includes the following major items: Demolition of existing motor control center (MCC). Installation of a new MCC, electrical panels, conduit, conductors, analog pressure gauge, mass flow meters, and variable frequency drives (VFDs).

Procurement method

Budget

Location

Country

United States of America (USA)

State

Montana

City

Hot Springs

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project