Hotel at The District
One of 10,000+ projects Taiyo tracks in Kansas.
Source: Dodge USA
Plans for a 6 story 160 room hotel. Exterior material include, Simulated Wood Cladding System, Exterior Insulated Finish System, Aluminum Storefront System with Clear Low-E Glazing, Prefinished Metal Coping, Prefinished Metal Canopy System, Prefinished VTAC Vent, Flush Hollow-Core Steel Door, Internally Illuminated Signage, Wall-Mounted Exterior Light, Prefinished Exterior Metal Panel System, Exte
- Status
- Prospective
- Sector
- Metal, Advanced Electronics, Steel, Cement, Manufacturing (Industrial), Hotel, Commercial
- Location
- Olathe, Kansas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hotel at The District
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Plans for a 6 story 160 room hotel. Exterior material include, Simulated Wood Cladding System, Exterior Insulated Finish System, Aluminum Storefront System with Clear Low-E Glazing, Prefinished Metal Coping, Prefinished Metal Canopy System, Prefinished VTAC Vent, Flush Hollow-Core Steel Door, Internally Illuminated Signage, Wall-Mounted Exterior Light, Prefinished Exterior Metal Panel System, Exterior Glazed Elevator Shaft, Architectural Masonry Unit, and Brick Masonry. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Olathe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Advanced Electronics, Steel, Cement, Manufacturing (Industrial), Hotel, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
