Hotel Building Floor 5
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Tenant Improvement: 548 Sq. Ft. To Renovate 5Th Floor Pool Bar And Kitchen With 1,175 Sq. Ft. Metal Patio Cover And New Splash Pad. Relocating Toilet In Mens Restroom. (5) Light Poles And 300 Sq. Ft. Trellis
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Hotel, Consumer Products, Metal
- Location
- Anaheim, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hotel Building Floor 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Tenant Improvement: 548 Sq. Ft. To Renovate 5Th Floor Pool Bar And Kitchen With 1,175 Sq. Ft. Metal Patio Cover And New Splash Pad. Relocating Toilet In Mens Restroom. (5) Light Poles And 300 Sq. Ft. Trellis |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Anaheim |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Hotel, Consumer Products, Metal |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
