Hotel Building Redevelopment
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Dodge USA
To redevelop the site with a hotel building comprised of a three-storey base building and two tower elements above, one fronting Spadina Avenue and the other Cameron Street, with total heights of 15 storeys (44.1 metres) and 17 storeys (49.4 metres) respectively. A total of 264 hotel suites are proposed. Parking and loading areas will be accessed via Cameron Street.
- Status
- Prospective
- Sector
- Car parking, Commercial, Road, Hotel, Residential, Automotive, Manufacturing (Industrial), Cement
- Location
- Toronto, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hotel Building Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | To redevelop the site with a hotel building comprised of a three-storey base building and two tower elements above, one fronting Spadina Avenue and the other Cameron Street, with total heights of 15 storeys (44.1 metres) and 17 storeys (49.4 metres) respectively. A total of 264 hotel suites are proposed. Parking and loading areas will be accessed via Cameron Street. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Toronto |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Road, Hotel, Residential, Automotive, Manufacturing (Industrial), Cement |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
