House 1949 / Narrative Architects
Sector: Steel • Location: South Korea
Source: ArchDaily
We treated the need for repair as the starting point of the design. Outside, we removed an illegally added portion of the second floor to create a terrace, and reinforced the existing stairs with metal, widening the treads to improve structural stability and circulation. The yard and terrace were finished with charcoal-colored granules, and thick steel railings were used to redefine the relationsh
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | We treated the need for repair as the starting point of the design. Outside, we removed an illegally added portion of the second floor to create a terrace, and reinforced the existing stairs with metal, widening the treads to improve structural stability and circulation. The yard and terrace were finished with charcoal-colored granules, and thick steel railings were used to redefine the relationship between the two outdoor spaces.Cracks in the exterior walls were repaired with mesh and granule finishes to restore both material quality and durability. Inside, structural columns were added only where necessary, and the roof was reinforced with metal tiles. A 1970s wallpaper pattern uncovered during demolition was reflected in the design of the pendant light in the living room—our only proposal that went beyond essential repair. The building has been given a new architectural life as a lodging.Text description provided by the architects.This house was originally built in 1949, just before the outbreak of the Korean War, and has since undergone several partial extensions and makeshift repairs, shaping it into its current form. The construction year was confirmed through an inscription on the ridge beam, and the structure—where even a span of less than three meters was bridged by piecing together door frames instead of using intact timber—reveals the architectural realities of Seoul at the time. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Steel projects in South Korea
- National Emergency Management Education & Research Complex
- Coupang Logistic Centre in Daegu
- LH New Head Office
- Hyundai Motorstudio Goyang
- Jeju Myths and History Theme Park R district
- The Busan New Port West Container Terminal Phase 2-5 project
- Samsung BioLogics’ Biological Manufacturing Facility, Songdo, South Korea
- Samsung Biologics Manufacturing Plant, Incheon, South Korea
