logo

House MM / Alventosa Morell Arquitectes

Sector: Geothermal

Source: ArchDaily

Project
Closed

Apart from the existing house, on the plot we find a swimming pool that is maintained due to the demands of the property and an auxiliary body that is used as a parking lot. This auxiliary body is demolished in order to regularize the regulations and enable the expansion.Text description provided by the architects.Located inValldoreix, on a plot of 800m² with a good orientation, the property asks

Project Information FAQ

Project Information

3 Q
The project “House MM / Alventosa Morell Arquitectes” is an infrastructure initiative in the Geothermal sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Apart from the existing house, on the plot we find a swimming pool that is maintained due to the demands of the property and an auxiliary body that is used as a parking lot. This auxiliary body is demolished in order to regularize the regulations and enable the expansion.Text description provided by the architects.Located inValldoreix, on a plot of 800m² with a good orientation, the property asks us to extend its home, construction from 1947 in a situation of volumetric non-conformity. The aim is to create a new independent volume where daughters and grandchildren can live.Built in concrete, the lower floor and upper floor respond logically to their situation. The first solid and closed to contain the earth and control thermal losses due to the lack of radiation. The second light and open to increase the relationship with the outside and solar capture. This strategy, together with the thermal inertia of concrete, a structural material to which no coating is added to make the most of its benefits, make the house comfortable all year round with a demand of 12.5 kW / m²year.The expansion needs program doubles the surface of the existing house and requires two floors. With these conditions and with the desire to generate a better relationship with the existing house and the North-South garden, we decided to take advantage of the 1.5 m difference in level between them, in order to semi-bury the building.The plot has a difference in level of 1.5 m between the pool and the northern part of the garden. The regulations limit the surface of the new building to 65m² on the ground floor.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data