House of Elementary Education / LP architektur
Sector: Forest Products and Packaging • Location: Austria
Source: ArchDaily
The newly-organized group rooms are organized equally to the south and supplemented with additional space (exercise rooms, dining areas, rest, and retreat areas on the top floor). An upstream, covered veranda-terrace construction expands the group rooms to the outside and forms the interface to the garden.Text description provided by the architects.Due to the reorganization and merging of the Flac
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The newly-organized group rooms are organized equally to the south and supplemented with additional space (exercise rooms, dining areas, rest, and retreat areas on the top floor). An upstream, covered veranda-terrace construction expands the group rooms to the outside and forms the interface to the garden.Text description provided by the architects.Due to the reorganization and merging of the Flachau andReitdorfkindergartens into one location, the existing elementary school was relocated and the stock was adapted and restructured for the new use, and expanded with a two-story wooden building.The timber construction, which is visible in all areas, generates an atmosphere of well-being and trust with the appropriate surfaces and furniture and offers support for the social contacts of the smallest of our society. The transparency between the rooms strengthens the visual relationships and conveys a sense of togetherness that goes beyond the formation of groups.This zones the property in arrival and in differentiated outdoor areas (paved and unpaved) and is connected to the existing building by means of a transition. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
