logo

House of the Child / Parada Cantilo Estudio

Sector: Road

Source: ArchDaily

Project
Closed

The transparency of the faces that transversely across the length of the terrain responds to the tension with the existing occupation and to the views towards the open space. Inside, the upper and lower face give warmth to the space through eucalyptus plating.Text description provided by the architects.This social project seeks to resolve the lack of a multipurpose space within a private, non-part

Project Information FAQ

Project Information

3 Q
The project “House of the Child / Parada Cantilo Estudio” is an infrastructure initiative in the Road sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The transparency of the faces that transversely across the length of the terrain responds to the tension with the existing occupation and to the views towards the open space. Inside, the upper and lower face give warmth to the space through eucalyptus plating.Text description provided by the architects.This social project seeks to resolve the lack of a multipurpose space within a private, non-partisan, ecumenical, and non-profit NGO called "La Casa del Niño Encuentro". This NGO not only provides school, health, and educational support in general but also breakfast, snacks, and lunch to children between 3 and 12 years old.As a particular detail towards the patio, the living room has a large projecting opening that offers different variants in terms of its use.The site destined for this new occupation is located behind the existing building which classrooms, dining room, and service areas. This results in a void where outdoor activities take place where the new room was installed.Given the need for a low-cost solution and dynamic development since it should not influence the occurring daily activities, a simple construction system was chosen in which few operations interfere and the optimization of materials is a priority. Therefore a weldable, light, and modulated iron structure was developed in which the repetition of the elements make the rigidity and make up the skeleton on which the envelope, the floor, and the roof rest.The new building is separated from the existing one obtaining cross ventilation along its route leaving a generously dimensioned patio as a finishing touch which responds to the good orientation. The independent implantation of the property generates a link with the exterior on both sides and allows a particular morphology that breaks with the imposed scheme and collaborates with its autonomy.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data