logo
ProjectClosed

House Z / Benoit Rotteleur Architecte

Sector: Commercial

Source: ArchDaily

Text description provided by the architects.This house was built in the 1980s, following the design codes of the time: a semi-subterranean ground floor housing the garage and boiler room, a raised floor above the garden for the living areas, and an attic converted into bedrooms. In the early 2000s, an extension was built on the garden side to accommodate a large living room, but it quickly showed

Status
Closed
Sector
Commercial, Residential, Car parking, Automotive
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about House Z / Benoit Rotteleur Architecte

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “House Z / Benoit Rotteleur Architecte” is an infrastructure initiative in the Commercial sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Text description provided by the architects.This house was built in the 1980s, following the design codes of the time: a semi-subterranean ground floor housing the garage and boiler room, a raised floor above the garden for the living areas, and an attic converted into bedrooms. In the early 2000s, an extension was built on the garden side to accommodate a large living room, but it quickly showed signs of deterioration. After a decade of legal proceedings, the owners were finally compensated for the damages suffered. They then decided to move on from those difficult years by considering the construction of a new house. However, the architect proposed a different approach: to retain as much of the existing structure as possible and demolish only the damaged sections.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Commercial, Residential, Car parking, Automotive

Article published date

2025-11-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project