Houston Lake Rd & Smithville Church Rd
Sector: Car parking • Location: Warner Robins, Georgia, United States of America
Source: Dodge USA
Project Description: The proposed construction consists of furnishing all materials and equipment and performing all labor necessary to complete the Intersection Improvements for S. Houston Lake Road at Smithy'Ile church Road (project roadway length is 0.227 miles). Work includes grading, curb & gutter, sidewalk, base placement, paving (including overlay), storm drainage, traffic signal installati
- Status
- Prospective
- Sector
- Car parking, Road, Commercial, Automotive, Government, Waste Processing and Treatment
- Location
- Warner Robins, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Houston Lake Rd & Smithville Church Rd
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: The proposed construction consists of furnishing all materials and equipment and performing all labor necessary to complete the Intersection Improvements for S. Houston Lake Road at Smithy'Ile church Road (project roadway length is 0.227 miles). Work includes grading, curb & gutter, sidewalk, base placement, paving (including overlay), storm drainage, traffic signal installation and the implementation of the erosion, sediment, and pollution control plan and comprehensive ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Warner Robins |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Commercial, Automotive, Government, Waste Processing and Treatment |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
