logo

HOUSTON LAKE RD FM SR 127 @ CR 279 TO SR 96/& INTER @ CR 188

Sector: Commercial • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project proposes to widen and reconstruct Houston Lake Road/CR 535 from just south of SR 127 to just south of SR 96 and to improve the existing SR 127 and Houston Lake Road intersection by realigning SR 127 to improve the horizontal alignment. The project length is approximately 3.56 miles. The existing two lane roadway will be widen to four 12-foot lanes, two in each direction, separated b

Project Information FAQ

Project Information

4 Q
The project “HOUSTON LAKE RD FM SR 127 @ CR 279 TO SR 96/& INTER @ CR 188” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project proposes to widen and reconstruct Houston Lake Road/CR 535 from just south of SR 127 to just south of SR 96 and to improve the existing SR 127 and Houston Lake Road intersection by realigning SR 127 to improve the horizontal alignment. The project length is approximately 3.56 miles. The existing two lane roadway will be widen to four 12-foot lanes, two in each direction, separated by a 20-foot raised median with curb and gutter and sidewalk on both sides of the road. The project is needed because the road is currently rural, but growth, both residential and commercial, is causing it to become urban in nature. The roadway is exceeding its capacity in areas along the project. As a major connecting link between Warner Robins and Perry, the road currently carries predominantly through traffic.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data