Hover Street Improvement
Delayed · Colorado · Last reported Aug 2024
Source: Dodge USA
This project will provide safety and traffic capacity improvements along a section of Longmont's principal north-south transportation corridor. The proposed improvements include the design and construction of a widened roadway to increase corridor capacity. The NB and SB travel lanes would be increased from two to three lanes in each direction. Improvements would extend from SH 119 (Ken Pratt Blvd
- Status
- Failure
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Longmont, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hover Street Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will provide safety and traffic capacity improvements along a section of Longmont's principal north-south transportation corridor. The proposed improvements include the design and construction of a widened roadway to increase corridor capacity. The NB and SB travel lanes would be increased from two to three lanes in each direction. Improvements would extend from SH 119 (Ken Pratt Blvd.) northward to Boston Avenue. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Longmont |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
