Howard Avenue Infrastructure Upgrades
Closed · New Brunswick · Last reported Apr 2021
Source: Dodge USA
In general, the work consists in the removal and replacement of existing water distribution piping, existing sanitary sewer collection piping and the installation of new storm sewer collection piping along with associated roadway repairs including new concrete curb and gutters and sidewalk and paving.
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Waste Processing and Treatment, Car parking, Automotive
- Location
- Campbellton, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Howard Avenue Infrastructure Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists in the removal and replacement of existing water distribution piping, existing sanitary sewer collection piping and the installation of new storm sewer collection piping along with associated roadway repairs including new concrete curb and gutters and sidewalk and paving. |
Procurement method | |
Budget |
Location
Country | Canada |
State | New Brunswick |
City | Campbellton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Waste Processing and Treatment, Car parking, Automotive |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
