Howard County Circuit Courthouse

Sector: Automotive • Location: Columbia, Maryland, United States of America

Source: Clark Construction

Project

The new Howard County Circuit Courthouse is the largest capital project in Howard County history and replaces the County’s 175-year-old historic courthouse that presented numerous deficiencies and challenges. The project features nine courtrooms, three hearing rooms, one grand jury room, and office space for six judges and their support staff. Additional areas within the building include a securit

Project Information FAQ

Project Information

5 Q
The project “Howard County Circuit Courthouse” is an infrastructure initiative in the Automotive sector, located in Columbia, Maryland, United States of America. Taiyo aggregates data on it from Clark Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new Howard County Circuit Courthouse is the largest capital project in Howard County history and replaces the County’s 175-year-old historic courthouse that presented numerous deficiencies and challenges. The project features nine courtrooms, three hearing rooms, one grand jury room, and office space for six judges and their support staff. Additional areas within the building include a security screening vestibule, a jury assembly area, and a cafeteria. The project also includes a 682-space parking garage adjacent to the building. Functional Design Decisions By using a mix of stone and glass, the building evokes mass, permanence, and gravitas alongside the transparency of the judicial system, and it showcases natural light and views throughout the public circulation systems. A roof trellis and colonnade evoke classical precedents and shade the glass from the southern exposure. The courthouse's four-story atrium helps orient visitors, directing them to services and functions throughout the building. In addition, the courthouse's safety and security measures are expressed in a double-height, curved pavilion at its front door, which frees its central atrium to serve as a space for people. Building circulation includes three distinct paths that safely separate the public, staff, and detainees, and with all 12 of the building's courtrooms accessible directly from its corridors, the public is made to feel more comfortable in the space. The courthouse building and parking garage – the largest capital project in Howard County history – is the result of a hybrid public-private partnership (P3), which leveraged the design, construction, financing, operation, and maintenance expertise of the Edgemoor-Star America Judicial Partners team, with Clark Construction serving as design-builder. This solution transferred risk away from the county, fixed costs, and ensured efficient and cost-effective delivery and long-term operations of the new courthouse. Hybrid P3 Sets Stage for Collaboration Under the P3 contract, the project team carefully considered the lifecycle cost of materials and ongoing operations and maintenance requirements, such as a hot-applied roofing system with a 30-year warranty, high-speed coiling doors with an anticipated replacement cycle that is five times longer than typical, and an extended 10-year maintenance contract for elevators. Building Information Modeling, or BIM, technology was critical to the project's quality control process, specifically in the interdisciplinary coordination of mechanical, electrical, plumbing, and technology systems during design and project development. Meeting the challenging high-tech infrastructure needs for a digital court and filing system required coordination with multiple stakeholders, including Howard County, court administration, county and state IT, sheriff's office, judges, clerks, and the local 911 command center. In addition, some technology systems reside on the state's IT network, some on the county's network, and some on a completely independent network. Each entity had different restrictions for its system, further complicating the effort. Likewise, the courthouse’s extensive detention control and general security systems had to be integrated throughout the building, including coordination with elevators, vehicle barriers, detention doors, standard commercial doors, fire alarms, and parking. Awards 2019 P3 Gold Award (Financial Structure) 2019 P3 Gold Award (Social Infrastructure)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data