Howard Street Implementation
Sector: Automotive • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Howard Street Implementation Share this: Facebook Twitter LinkedIn SFMTA.com/HowardStreetscape Project Introduction The Howard Streetscape Project area includes Howard Street, a westbound one-way street, that extends from 4th to 11th streets. Howard Street runs parallel to Folsom and Mission streets. The Moscone Convention Center, one of the largest traffic generators in the City, is located withi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | preliminary engineering |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Howard Street Implementation Share this: Facebook Twitter LinkedIn SFMTA.com/HowardStreetscape Project Introduction The Howard Streetscape Project area includes Howard Street, a westbound one-way street, that extends from 4th to 11th streets. Howard Street runs parallel to Folsom and Mission streets. The Moscone Convention Center, one of the largest traffic generators in the City, is located within the corridor and prior to the pandemic received one million visitors per year. The project will address dire safety concerns on Howard Street that resulted in three fatalities on the corridor between 2014 and 2019. In total, 152 traffic collisions have occurred on the Folsom-Howard couplet over this time, placing the corridor on San Francisco’s Vision Zero High Injury Network, where 13 percent of San Francisco's streets endure 75 percent of the total severe and fatal traffic collisions. More than half of these collisions involved a person walking or biking. Project Components Once completed, Howard Street will implement the following treatments: Roadway Configuration Changes Removal of one westbound travel lane on Howard Street between 4th and 11th streets Repaving of the Howard Street corridor Pedestrian Safety Improvements New corner bulb-outs that shorten crossing distances Traffic signals with improved timing Raised bikeway crossings that will prioritize pedestrians Leading Pedestrian Intervals or pedestrian head starts Raised crosswalks at alleyways Bicycle Safety Improvements New two-way protected bike lane on Howard from 4th to 11th streets Concrete buffers for parking-protected bikeways New concrete protection for bicyclists in intersections New separated bike signals with dedicated phases for cyclists and turning vehicles Raised bikeways at select alley crossings to prioritize a cyclist’s right-of-way Loading and Parking Improvements ADA compliant passenger loading zones to accommodate wheelchair ramp deployment Public Realm Improvements Tree-lined medians Civic Amenity Zones, or pedestrian spaces with customized pavers, historic plaques and district street signs New pedestrian street lighting Immediate Need to Address Safety Beginning in 2019, t he SFMTA completed “Quick-Build” improvements on Howard Street from 11th to 3rd streets with a Class IV parking- protected bicycle lane and Howard Street between 3rd Street and The Embarcadero using effective temporary and adjustable measures such as paint, traffic delineators, and signage. Upgrade the existing bike lane to a parking-protected bikeway in the westbound direction to provide a more comfortable and separated space for people riding bikes Daylighting at intersections and driveways to improve intersection visibility Increase the number of yellow zones to improve loading for commercial businesses Traffic lane reduction to redistribute roadway space for all road users Project Timeline Planning and Conceptual Design 2016 to 2019 Pending Legislation 2019 Pending Detailed Design Mid-2023 Pending Construction 2025 Pending Cost Estimate $49m Predicted Completion 2027 Project Status Preliminary Engineering Contact Information FolsomHoward@sfmta.com Alan Uy, Project Manager Alan.Uy@sfmta.com 415.646.2469 Adrienne Heim, Transportation Planner Adrienne.Heim@sfmta.com 415.646.2564 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
