HPCC Parking Lot
Sector: Water Supply and Storage • Location: Highland Park, Illinois, United States of America
Source: Dodge USA
SCOPE OF WORK Work in this contract includes HMA Surface Removal, Pavement Patching, New HMA Pavement, New Concrete Curb Installation, New PCC Shoulders, Curb and Gutter Removal, PCC Sidewalk, Minor Landscape Restoration, Storm Sewer and Drainage Structure Construction, Light Pole Installation, and other associated improvements.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Car parking, Cement, Road, Automotive, Government, Commercial
- Location
- Highland Park, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about HPCC Parking Lot
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK Work in this contract includes HMA Surface Removal, Pavement Patching, New HMA Pavement, New Concrete Curb Installation, New PCC Shoulders, Curb and Gutter Removal, PCC Sidewalk, Minor Landscape Restoration, Storm Sewer and Drainage Structure Construction, Light Pole Installation, and other associated improvements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Highland Park |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Car parking, Cement, Road, Automotive, Government, Commercial |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
