HPFL Sanquhar & Delta SHPP

Sector: Wind • Location: Sri Lanka

Source: World Bank Group

Project
Active

Hydro Power Free Lanka, majority owned by Free Lanka Capital, was developing the Sanquhar and Delta small hydropower plants, of 1.6MW each. The plants are located on two tea estates carrying the same name, in Kandy District, Central Province. Both estates are operated by Pussellawa Plantations, under a long term lease from the Sri Lankan government.

Sanquhar was commissioned in December 2003. D

Project Information FAQ

Project Information

4 Q
The project “HPFL Sanquhar & Delta SHPP” is an infrastructure initiative in the Wind sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hydro Power Free Lanka, majority owned by Free Lanka Capital, was developing the Sanquhar and Delta small hydropower plants, of 1.6MW each. The plants are located on two tea estates carrying the same name, in Kandy District, Central Province. Both estates are operated by Pussellawa Plantations, under a long term lease from the Sri Lankan government. Sanquhar was commissioned in December 2003. Delta was commissioned in April 2006. Construction of Delta started in November 2004. The output was sold to the Ceylon Electricity Board under a Standard Power Purchase Agreement for plants under 10MW. The equipment supplier was Hydro Power SA (France), with 1 Francis turbine for Sanquhar, and 1 Vertical Pelton turbine for Delta. Expected life was 25 years for both plants. Total cost was unknown but conservatively estimated at US$1 million/MW, or US$3.6 million. Financial closure date was unknown, but ESTIMATED at November 2004, start of construction of Delta. The projects applied for UNFCCC CDM financing jointly. The coordinates are: Sanqhuar 80°35.906” 7°06.950” Delta 80o 39’63’’ 07o 07’54’’ https://cdm.unfccc.int/filestorage/2/V/B/2VB75RCOWG3OPA6V4ZSZCBFI99I94M/HPFL%20PDD%20VER10.pdf?t=Nkd8bWV2enhjfDDRFL4dDgHWlU5Dvy-bkkLw

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data