logo

HPI Kabaragala SHPP

Sector: Hydro • Location: Sri Lanka

Source: World Bank Group

Project
Active

Hydro Power International (HPI) developed the 2.25MW Kabaragala small hydropower plant, Nuwara Eliya District, Sri Lanka. The project company was Natural Power Pvt. Ltd., a joint venture between HPI and Naturab Group (also known as: Naturub Group). The turbine was a Pelton Wheel. The project feeds from the Medapitiya Oya River.

The project signed a Standard PPA with the utility in March 2000, to

Project Information FAQ

Project Information

5 Q
The project “HPI Kabaragala SHPP” is an infrastructure initiative in the Hydro sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hydro Power International (HPI) developed the 2.25MW Kabaragala small hydropower plant, Nuwara Eliya District, Sri Lanka. The project company was Natural Power Pvt. Ltd., a joint venture between HPI and Naturab Group (also known as: Naturub Group). The turbine was a Pelton Wheel. The project feeds from the Medapitiya Oya River. The project signed a Standard PPA with the utility in March 2000, to generate 1.5MW for delivery to the national grid. The project was commissioned in May 2001. Construction started in December 1999. The turbine was supplied by Shanghai Marine (China), the generator by Stamford (UK), the transformer by Lanka Transformer (Sri Lanka), the substation by ABB (India), the control system by KIK. Total project cost was ESTIMATED at US$2.3 based on a conservative US$1 million/MW. Financial closure date was ESTIMATED at May 2001, date of commissioning. http://www.hydropowerinternational.com/kabaragala-completed.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data