HPL Switches Replacement Phase 1
Closed · Florida · Last reported Nov 2024
Source: Dodge USA
Engineering services to provide design, bidding, permitting and construction phase services for the replacement of high potential load-break ( HPL ) switches with dead front pad-mounted equipment ( PME ) switches to provide redundancy for outages in the substation serving Pavilions around EPCOT.
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Consumer Products, Government
- Location
- Orlando, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about HPL Switches Replacement Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering services to provide design, bidding, permitting and construction phase services for the replacement of high potential load-break ( HPL ) switches with dead front pad-mounted equipment ( PME ) switches to provide redundancy for outages in the substation serving Pavilions around EPCOT. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Consumer Products, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
