logo

HS2 contracts confirmed for STRABAG, Skanska and Costain Joint Venture

Sector: Rail • Location: London and Birmingham, United Kingdom

Source: Highways Today

Project
Ongoing

HS2, the planned high-speed rail line in Britain linking London and Birmingham over a length of 225 km in Phase One, continues to gain momentum. The client, High Speed Two (HS2) Ltd has given the green light for Stage 2, the realisation of the two Southern Lots S1 and S2 with a total length of just under 26 km, to the joint venture consisting of STRABAG, Skanska and Costain. The contract will invo

Project Information FAQ

Project Information

4 Q
The project “HS2 contracts confirmed for STRABAG, Skanska and Costain Joint Venture” is an infrastructure initiative in the Rail sector, located in London and Birmingham, United Kingdom. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

HS2, the planned high-speed rail line in Britain linking London and Birmingham over a length of 225 km in Phase One, continues to gain momentum. The client, High Speed Two (HS2) Ltd has given the green light for Stage 2, the realisation of the two Southern Lots S1 and S2 with a total length of just under 26 km, to the joint venture consisting of STRABAG, Skanska and Costain. The contract will involve the design and construction of the Euston Tunnels and Approaches and the Northolt Tunnels. In Stage 1, the joint venture had been awarded the scheme design and site preparation (including pricing and scoping) for the main civil works. The contract awarded today signals the transition from the scheme design and preparatory work to the full detailed design and construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data