logo
ProjectDelayed

HS2 High-Speed Rail Project

The owner, status and timeline of this project. A free account opens every field.

Source: Financial Post

HS2 is a high-speed rail project originally designed to link London to Manchester and Leeds via Birmingham. The project has faced delays and cost overruns, with costs rising to as much as £98 billion by 2020, up from an initial estimate of £37.5 billion for the entire network.

Status
Failure
Sector
Rail, Government
Location
London, England, United Kingdom
Updated
22 Jul 2026
Source
Financial Post

ConstructChat

Ask ConstructChat about HS2 High-Speed Rail Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “HS2 High-Speed Rail Project” is an infrastructure initiative in the Rail sector, located in London, England, United Kingdom. Taiyo aggregates data on it from Financial Post.

Participants

Sponsoring Agency

Status

Original status

delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

HS2 is a high-speed rail project originally designed to link London to Manchester and Leeds via Birmingham. The project has faced delays and cost overruns, with costs rising to as much as £98 billion by 2020, up from an initial estimate of £37.5 billion for the entire network.

Original sector

Transport

Budget

Location

Country

United Kingdom (UK)

State

England

City

London

Source

Source

Financial Post

URL

More Details

Record type

Project

Sector

Rail, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project