HS2 River Tame West Viaduct
Sector: Water Supply and Storage • Location: Water Orton, England, United Kingdom
Source: BBC
The HS2 construction has reached a peak with the completion of the first of 13 viaducts at the Delta Junction site near Water Orton, Warwickshire. The 472m single-track River Tame West viaduct is designed to carry three rail tracks and is part of a larger project that will connect London to Birmingham and beyond.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Rail, Bridge
- Location
- Water Orton, England, United Kingdom
- Updated
- 22 Jul 2026
- Source
- BBC
ConstructChat
Ask ConstructChat about HS2 River Tame West Viaduct
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The HS2 construction has reached a peak with the completion of the first of 13 viaducts at the Delta Junction site near Water Orton, Warwickshire. The 472m single-track River Tame West viaduct is designed to carry three rail tracks and is part of a larger project that will connect London to Birmingham and beyond. |
Original sector | Rail |
Location
Country | United Kingdom (UK) |
State | England |
City | Water Orton |
Source
Source | BBC |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Bridge |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
