logo

HS2 Washwood Heath Depot and Network Integrated Control Centre

One of 5,135 projects Taiyo tracks in England.

Source: Travel And Tour World

Project
Awarded

The United Kingdom has awarded the contract for the High Speed 2 (HS2) Washwood Heath depot and Network Integrated Control Centre in Birmingham, advancing its flagship rail infrastructure programme.

Status
Closed
Sector
Mass Transit, Rail
Location
Birmingham, England, United Kingdom
Updated
22 Jul 2026
Source
Travel And Tour World

ConstructChat

Ask ConstructChat about HS2 Washwood Heath Depot and Network Integrated Control Centre

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “HS2 Washwood Heath Depot and Network Integrated Control Centre” is an infrastructure initiative in the Mass Transit sector, located in Birmingham, England, United Kingdom. Taiyo aggregates data on it from Travel And Tour World.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The United Kingdom has awarded the contract for the High Speed 2 (HS2) Washwood Heath depot and Network Integrated Control Centre in Birmingham, advancing its flagship rail infrastructure programme.

Original sector

Transportation

Location

Country

United Kingdom (UK)

State

England

City

Birmingham

Source

Source

Travel And Tour World

URL

More Details

Record type

Project

Sector

Mass Transit, Rail

Article published date

2026-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project