HSIP Cycle 11 Macdonald Avenue Pedestrian Crossing Improve
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
In general, the work to be performed under these specifications consists of complete streets related improvements to MacDonald Ave, from 30th Street to 31st Street in Richmond, California. The work to be performed includes, but is not limited to, providing traffic control during the construction period, construction surveying, utility potholing, clearing, grubbing, and environmental protection, re
- Status
- Closed
- Sector
- Car parking, Rail, Mass Transit, Road, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Government
- Location
- Richmond, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about HSIP Cycle 11 Macdonald Avenue Pedestrian Crossing Improve
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work to be performed under these specifications consists of complete streets related improvements to MacDonald Ave, from 30th Street to 31st Street in Richmond, California. The work to be performed includes, but is not limited to, providing traffic control during the construction period, construction surveying, utility potholing, clearing, grubbing, and environmental protection, removal of concrete curbs, sidewalk, valley gutter, and driveways, removal of trees and tree stumps... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Richmond |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Rail, Mass Transit, Road, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
