HTHW Pipe Replacement
One of 10,000+ projects Taiyo tracks in Connecticut.
Source: Dodge
Project consists of 1. Replacement of the existing High Temperature Hot Water Lines ("HTHW") lines from Manhole 4N to 6N. Pipe modifications within MH 4n and 6N. Removal and installation of concrete anchor blocks, trench excavation, trench preparation and backfilling operations. 2. Installation of electrical conduit and Quazite junction boxes for future use. 3. The project also consists of removal
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Commercial, Cement
- Location
- Willimantic, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about HTHW Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of 1. Replacement of the existing High Temperature Hot Water Lines ("HTHW") lines from Manhole 4N to 6N. Pipe modifications within MH 4n and 6N. Removal and installation of concrete anchor blocks, trench excavation, trench preparation and backfilling operations. 2. Installation of electrical conduit and Quazite junction boxes for future use. 3. The project also consists of removal and replacement of site elements, such as, sidewalks, seat walls, lighting, and landscaping |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Willimantic |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Commercial, Cement |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
