logo

Huai River Basin Flood Management and Drainage Improvement

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Closed

The objective of the Huai River Basin Flood Management and Drainage Improvement Project for China is to provide better and more secure protection against floods and water logging, increase farmland productivity, and reduce property losses in predominantly poor rural areas in the Huai river basin in the provinces of Jiangsu, Shandong, Anhui and Henan. There are five components to the project, the f

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Huai River Basin Flood Management and Drainage Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Huai River Basin Flood Management and Drainage Improvement” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Huai River Basin Flood Management and Drainage Improvement Project for China is to provide better and more secure protection against floods and water logging, increase farmland productivity, and reduce property losses in predominantly poor rural areas in the Huai river basin in the provinces of Jiangsu, Shandong, Anhui and Henan. There are five components to the project, the first component being flood protection and drainage improvement. Carrying out of flood protection and drainage improvement works in the project area including: strengthening of dikes; improving waterways through, inter alia, river dredging, drainage channel excavation, and river bank reinforcement and stabilization; and construction, rehabilitation, replacement and expansion of flood control works, including pumping stations, cross-dike structures, sluice gates and bridges. The second component is the disaster assessment and support system. The third component is the institutional strengthening. Strengthening the capacity of the project implementing entities in critical areas related to the project including: dike maintenance; design and construction; modern construction technologies; and data collection and decision support systems for flood forecasting systems, emergency preparedness plans and river modeling. The fourth component is the resettlement action plan implementation. Finally, the fifth component is the project management.

Original sector

FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project