logo

Huai River Basin Flood Management and Drainage Improvement

Sector: Water Supply and Storage • Location: China

Source: World Bank

Project
Closed

The objective of the Huai River Basin Flood Management and Drainage Improvement Project for China is to provide better and more secure protection against floods and water logging, increase farmland productivity, and reduce property losses in predominantly poor rural areas in the Huai river basin in the provinces of Jiangsu, Shandong, Anhui and Henan. There are five components to the project, the f

Project Information FAQ

Project Information

5 Q
The project “Huai River Basin Flood Management and Drainage Improvement” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Huai River Basin Flood Management and Drainage Improvement Project for China is to provide better and more secure protection against floods and water logging, increase farmland productivity, and reduce property losses in predominantly poor rural areas in the Huai river basin in the provinces of Jiangsu, Shandong, Anhui and Henan. There are five components to the project, the first component being flood protection and drainage improvement. Carrying out of flood protection and drainage improvement works in the project area including: strengthening of dikes; improving waterways through, inter alia, river dredging, drainage channel excavation, and river bank reinforcement and stabilization; and construction, rehabilitation, replacement and expansion of flood control works, including pumping stations, cross-dike structures, sluice gates and bridges. The second component is the disaster assessment and support system. The third component is the institutional strengthening. Strengthening the capacity of the project implementing entities in critical areas related to the project including: dike maintenance; design and construction; modern construction technologies; and data collection and decision support systems for flood forecasting systems, emergency preparedness plans and river modeling. The fourth component is the resettlement action plan implementation. Finally, the fifth component is the project management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data