logo

Huai'an District Wastewater Treatment Plant

Sector: Mass Transit • Location: China

Source: World Bank Group

Project
Active

The project involves the investment, financing, construction, operation and maintenance of wastewater treatment plant in Huai'an District, Huai'an City, Jiangsu Province of China. The designed capacity is 40,000 tons / day (14.6 million tonnes per year). The SPV is called Huai'an First Ecological Environment Co., Ltd and is owned by Beijing Capital Co., Ltd with 64.98% stake, China Railway Shangha

Project Information FAQ

Project Information

4 Q
The project “Huai'an District Wastewater Treatment Plant” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the investment, financing, construction, operation and maintenance of wastewater treatment plant in Huai'an District, Huai'an City, Jiangsu Province of China. The designed capacity is 40,000 tons / day (14.6 million tonnes per year). The SPV is called Huai'an First Ecological Environment Co., Ltd and is owned by Beijing Capital Co., Ltd with 64.98% stake, China Railway Shanghai Engineering Bureau Group Co., Ltd with 0.01% stake, Zhongshe Design Group Co., Ltd with 0.01% stake, Shuihui Environment (Tianjin) Equity Investment Fund Management Co., Ltd with 30% stake and state owned Huai'an Hongxin State-owned Assets Investment Management Co., Ltd with 5% stake. The project cost amounts to CNY 1,624,710,000 or $ 242.53 million. The project is structured under BOT model for a concession period of 28 years which includes 3 years construction period. The return mechanism is feasibility gap subsidy. Financial close was reached on 27 February 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=50b33d3a40c040d2a357c6aadeb4dc0e

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data