logo

Huai'an District Wastewater Treatment Plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

The project involves the investment, financing, construction, operation and maintenance of wastewater treatment plant in Huai'an District, Huai'an City, Jiangsu Province of China. The designed capacity is 40,000 tons / day (14.6 million tonnes per year). The SPV is called Huai'an First Ecological Environment Co., Ltd and is owned by Beijing Capital Co., Ltd with 64.98% stake, China Railway Shangha

Status
Prospective
Sector
Water Supply and Storage, Mass Transit, Waste Processing and Treatment, Rail, Government, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Huai'an District Wastewater Treatment Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Huai'an District Wastewater Treatment Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the investment, financing, construction, operation and maintenance of wastewater treatment plant in Huai'an District, Huai'an City, Jiangsu Province of China. The designed capacity is 40,000 tons / day (14.6 million tonnes per year). The SPV is called Huai'an First Ecological Environment Co., Ltd and is owned by Beijing Capital Co., Ltd with 64.98% stake, China Railway Shanghai Engineering Bureau Group Co., Ltd with 0.01% stake, Zhongshe Design Group Co., Ltd with 0.01% stake, Shuihui Environment (Tianjin) Equity Investment Fund Management Co., Ltd with 30% stake and state owned Huai'an Hongxin State-owned Assets Investment Management Co., Ltd with 5% stake. The project cost amounts to CNY 1,624,710,000 or $ 242.53 million. The project is structured under BOT model for a concession period of 28 years which includes 3 years construction period. The return mechanism is feasibility gap subsidy. Financial close was reached on 27 February 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=50b33d3a40c040d2a357c6aadeb4dc0e

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Mass Transit, Waste Processing and Treatment, Rail, Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project