Huang's Home / ZHUI Design Studio
Sector: Road
Source: ArchDaily
The overall design plan aimed to reduce the oppressive feeling of physical walls and ceiling-high cabinets, providing storage functionality while adapting to the spatial needs of different life stages.Nearby, there was a large drain filled with domestic water, and if a window was opened at the back of the house, an indescribable odor would permeate. Due to the close proximity of the buildings, the
- Status
- Closed
- Sector
- Road, Car parking, Water Supply and Storage, Residential, Waste Processing and Treatment, Commercial, Government, Automotive
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Huang's Home / ZHUI Design Studio
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The overall design plan aimed to reduce the oppressive feeling of physical walls and ceiling-high cabinets, providing storage functionality while adapting to the spatial needs of different life stages.Nearby, there was a large drain filled with domestic water, and if a window was opened at the back of the house, an indescribable odor would permeate. Due to the close proximity of the buildings, the natural light at the back of the houses was also poor. Therefore, upon entering the house, my immediate concern was how to address these challenges that haunted my childhood memories.Text description provided by the architects.In the rapid development process of urbanization in towns and cities, there is often a lack of proper urban planning. In my childhood memories, the impression of that area was rows of tightly built houses with minimal separation between them and only a mini drainage ditch serving as a fire lane in the rear.In the old town where parking was relatively difficult, the unwritten rule of "first come, first served" had become deeply ingrained. As a result, we removed the unsuitable walls that encroached upon the street layout to create parking spaces. Simultaneously, we introduced light into the interior, sealing off doors and windows facing the fire lane at the rear. We transformed the space by creating a courtyard, solving both lighting and odor issues. The opening of the courtyard allowed sunlight and rain to fall on the planted deciduous shrubs, creating an environment that could be sensed even indoors. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Water Supply and Storage, Residential, Waste Processing and Treatment, Commercial, Government, Automotive |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
