Huaxi section, part of the southern section of Huaguan Road
Sector: Commercial • Location: Guizhou, China
Source: World Bank Group
The starting point of the road is Datong Mountain, Jingu Qiao Ziyuan, Guida South Campus (Agricultural College), Shangshangdi North Road, Huaxi Lake in the planning, and the end of the intersection at Jiaxiu South Road and Yingbin Road. . The road grade of this project is urban trunk road, with a total length of 1.876km, width of road width of 40.0m, two-way six lanes, design speed of 60km/h, asph
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The starting point of the road is Datong Mountain, Jingu Qiao Ziyuan, Guida South Campus (Agricultural College), Shangshangdi North Road, Huaxi Lake in the planning, and the end of the intersection at Jiaxiu South Road and Yingbin Road. . The road grade of this project is urban trunk road, with a total length of 1.876km, width of road width of 40.0m, two-way six lanes, design speed of 60km/h, asphalt concrete pavement. A total of 1 bridge (277.8m Huaxi Lake Bridge) and 2 tunnels (300m in the Huaxi section of the Datongshan Tunnel and 530m in the Guida Tunnel) are set up. The project includes: construction engineering (building of the campus of Guida Campus), route, line foundation, road surface, tunnel, bridge, interchange, integrated pipe network, slope protection and support, traffic safety engineering, lighting and power supply and distribution, landscape And ancillary works such as greening, road fire and ventilation. SPV is Guiyang Xijing City Construction Co., Ltd., a JV between the sponsors Guiyang City Development Investment (Group) Co., Ltd. (90%) and the state-owned Guiyang Chengnan Real Estate (Group) Co., Ltd. (10%). Type of concession is BOT and contract period is 15 years. Financial close took place on January 28, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=87cd2f142cd94d9b8e3175212ce84a37 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
