Huaxi section, part of the southern section of Huaguan Road
Sector: Commercial • Location: Guizhou, China
Source: World Bank Group
The starting point of the road is Datong Mountain, Jingu Qiao Ziyuan, Guida South Campus (Agricultural College), Shangshangdi North Road, Huaxi Lake in the planning, and the end of the intersection at Jiaxiu South Road and Yingbin Road. . The road grade of this project is urban trunk road, with a total length of 1.876km, width of road width of 40.0m, two-way six lanes, design speed of 60km/h, asph
- Status
- Prospective
- Sector
- Commercial, Bridge, Cement, Power Generation (CCGT), Raw Materials, Residential, Tunnel, Road, Government
- Location
- Guizhou, China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Huaxi section, part of the southern section of Huaguan Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The starting point of the road is Datong Mountain, Jingu Qiao Ziyuan, Guida South Campus (Agricultural College), Shangshangdi North Road, Huaxi Lake in the planning, and the end of the intersection at Jiaxiu South Road and Yingbin Road. . The road grade of this project is urban trunk road, with a total length of 1.876km, width of road width of 40.0m, two-way six lanes, design speed of 60km/h, asphalt concrete pavement. A total of 1 bridge (277.8m Huaxi Lake Bridge) and 2 tunnels (300m in the Huaxi section of the Datongshan Tunnel and 530m in the Guida Tunnel) are set up. The project includes: construction engineering (building of the campus of Guida Campus), route, line foundation, road surface, tunnel, bridge, interchange, integrated pipe network, slope protection and support, traffic safety engineering, lighting and power supply and distribution, landscape And ancillary works such as greening, road fire and ventilation. SPV is Guiyang Xijing City Construction Co., Ltd., a JV between the sponsors Guiyang City Development Investment (Group) Co., Ltd. (90%) and the state-owned Guiyang Chengnan Real Estate (Group) Co., Ltd. (10%). Type of concession is BOT and contract period is 15 years. Financial close took place on January 28, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=87cd2f142cd94d9b8e3175212ce84a37 |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
State | Guizhou |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Cement, Power Generation (CCGT), Raw Materials, Residential, Tunnel, Road, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in China
- Black Point Combined Cycle Power Plant Hong Kong
- Hongyanhe Nuclear Power Plant Liaoning
- Yangcheng CoalFired Power Plant Shanxi Province
- Tianhuangping PumpedStorage Hydro Plant
- Xiangjiaba Hydropower Plant
- Fuqing Nuclear Power Plant Fujian
- Huoqiu County Pipeline Gas Project
- Fuchuan Xiehe Shijia Wind Power Plant