Hubbard County Bridge Replacement
Sector: Cement • Location: Park Rapids, Minnesota, United States of America
Source: Dodge
BRIDGE REPLACEMENT Major Items: Remove Existing Bridge 1 ea. Prestressed Concrete Beams 396 lin. ft. Structural Concrete 86 cu. Yd. Bridge Slab Concrete 3127 sq. ft. Type SP 9.5 Wearing Course Mix(3,C) 555 ton Traffic Control Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | BRIDGE REPLACEMENT Major Items: Remove Existing Bridge 1 ea. Prestressed Concrete Beams 396 lin. ft. Structural Concrete 86 cu. Yd. Bridge Slab Concrete 3127 sq. ft. Type SP 9.5 Wearing Course Mix(3,C) 555 ton Traffic Control Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
