Hubei Songzi Pumped Storage Power Station (1200MW)
Sector: Hotel • Location: China
Source: World Bank Group
The project comprises the construction of Hubei Songzi pumped storage power station, located in Xiajiaping Tujia Township, Songzi City, Hubei Province, China. The sponsor is State Energy Group Changyuan Power Co. The investment reaches $1.127 billion (8.198 billion yuan). It started construction on December 5, 2024. It is a major energy project in the ""14th Five-Year Plan"" of the National Energy
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project comprises the construction of Hubei Songzi pumped storage power station, located in Xiajiaping Tujia Township, Songzi City, Hubei Province, China. The sponsor is State Energy Group Changyuan Power Co. The investment reaches $1.127 billion (8.198 billion yuan). It started construction on December 5, 2024. It is a major energy project in the ""14th Five-Year Plan"" of the National Energy Administration and was surveyed and designed by the Central South Institute. The power station has an installed capacity of 1200MW, an annual power generation of 1.34 billion kilowatt-hours, and is equipped with 4 single-stage mixed flow reversible pump-turbine units with a single unit capacity of 300,000 kilowatts. After completion and commissioning, the Songzi Pumped Storage Power Station will undertake tasks such as power peak regulation, energy storage, frequency regulation, phase regulation and emergency backup in western Hubei, injecting strong impetus into promoting the construction of a new power system, improving local infrastructure, boosting transportation, tourism and employment in ethnic areas, achieving the ""dual carbon"" goals and accelerating the comprehensive revitalization of rural areas. https://www.seetaoe.com/details/197865.html; https://www.seetaoe.com/details/195517.html |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
