logo
ProjectClosed

Huber Engineered Woods Access Road

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The project consists of constructing an access road from U.S. Hwy 45 to Hwy 145 providing access to Huber Engineered Woods. The principle items of work include grading, drainage, base, non-reinforced concrete pavement, hot mix asphalt surfacing, erosion control and striping for 0.259 miles of road and associated acceleration /deceleration turn lanes. The above general outline of features of the wo

Status
Closed
Sector
Water Supply and Storage, Government, Road, Cement, Waste Processing and Treatment, Commercial
Location
Macon, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Huber Engineered Woods Access Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Huber Engineered Woods Access Road” is an infrastructure initiative in the Water Supply and Storage sector, located in Macon, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of constructing an access road from U.S. Hwy 45 to Hwy 145 providing access to Huber Engineered Woods. The principle items of work include grading, drainage, base, non-reinforced concrete pavement, hot mix asphalt surfacing, erosion control and striping for 0.259 miles of road and associated acceleration /deceleration turn lanes. The above general outline of features of the work does not in any way limit the responsibility of the contractor to perform the work and furnish...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Macon

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Cement, Waste Processing and Treatment, Commercial

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project