Hudson Yards Concrete Casing – Section 3 (HYCC-3)
Sector: Tunnel • Location: New York, USA
Source: Construction Review
Construction of the Hudson Yards Concrete Casing – Section 3 (HYCC-3), a heavily reinforced concrete structure that provides the essential connection between the new Hudson River rail tunnel and New York Penn Station. The structure is approximately 500 feet long, 60 feet wide, and 60 feet deep, with walls ranging from 3.5 to 10 feet thick and surrounded by a waterproof membrane.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Under Construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of the Hudson Yards Concrete Casing – Section 3 (HYCC-3), a heavily reinforced concrete structure that provides the essential connection between the new Hudson River rail tunnel and New York Penn Station. The structure is approximately 500 feet long, 60 feet wide, and 60 feet deep, with walls ranging from 3.5 to 10 feet thick and surrounded by a waterproof membrane. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
