Hugh Brinson Pipeline
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
To be constructed in two phases. First phase to have about 442 miles of pipelines, size 42 diameter (inches) 1.5 Bcf/d, extending from Waha to Maypearl, TX and connect to Energy Transfer pipeline and storage infrastructure - Phase I targeted operational end of 2026. Part of Phase one will also include a 42 mile, 36 inch lateral called the Midland Lateral to connect plants in Martin and Midland Cou
- Status
- Under Construction
- Sector
- Chemical (Industrial), Oil and Gas, Manufacturing (Industrial), Commercial
- Location
- Midland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hugh Brinson Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To be constructed in two phases. First phase to have about 442 miles of pipelines, size 42 diameter (inches) 1.5 Bcf/d, extending from Waha to Maypearl, TX and connect to Energy Transfer pipeline and storage infrastructure - Phase I targeted operational end of 2026. Part of Phase one will also include a 42 mile, 36 inch lateral called the Midland Lateral to connect plants in Martin and Midland Counties to the main pipeline. Phase Two increases the pipeline capacity to 2.2 Bcf/d, could be done... |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Midland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Oil and Gas, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- Camden Street Drain Replacement
- City of Manassas Water Treatment Plant Clearwell No. 2
- Discovery Park Chemical Toilet Replacement
- Contract for the Orinda Water Treatment Plant Disinfection and Chemical Systems Safety Improvements Project in Orinda, California (United States)
- SR 1; SR 53 & SR 341 @ 8 LOCS IN FLOYD & WALKER COUNTY
- BRIDGE PRESERVATION @ 11 SR LOCS IN DISTRICT 3
- I-75 @ 1 LOC;I-85 @ 2 LOC & I-285 @1 LOC-BRIDGE PRESERVATION
