Huila-Cunene Interconnection Project
Sector: Solar • Location: Angola
Source: World Bank Group
The proposed project aims finance Angola’s investment obligations towards the Angola-Namibia (ANNA) interconnection project which will create the transmission capacity needed in Angola to integrate with SAPP. It is part of Phase 2 of the Regional Energy Transmission, Trade and Decarbonization Project multiphase programmatic approach (RETRADE MPA). The ANNA transmission project consists of approxim
- Status
- Prospective
- Sector
- Solar, Power Transmission, Wind, Power Generation (CCGT), Hydro, Government
- Location
- Angola
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Huila-Cunene Interconnection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed project aims finance Angola’s investment obligations towards the Angola-Namibia (ANNA) interconnection project which will create the transmission capacity needed in Angola to integrate with SAPP. It is part of Phase 2 of the Regional Energy Transmission, Trade and Decarbonization Project multiphase programmatic approach (RETRADE MPA). The ANNA transmission project consists of approximately 366 km of 400 kV transmission line, of which 321 km is in Angola. The estimated costs for the proposed project in Angola is US$470 million, with an IBRD contribution of US$350 million and private sector financing of US$115 million. Two transmission lines will be financed under the proposed project through a mix of public and private financing, namely: the Lubango-Cahama-Namibian Border (Cunene) (segments A-B-C in Figure 1); and the Cahama-Ondjiva (segment B-D), with a potential substation in Xangongo. The segments A-B-D will be financed through a public ownership model and will extend hydro-dominated electricity to the isolated southern provinces that still use diesel generators. This will reduce the cost of electricity, reduce emissions, and improve the reliability of the service. It will also support government programs to increase access to electricity and facilitate the deployment of solar PV plants in an area with abundant solar resources and the expansion of industries. Segment B-C will be developed under a privately financed transmission (PFT) model to integrate Angola into SAPP, facilitating the export of unused surplus electricity and generating revenue for the power sector.In Namibia, the scope of works includes the 45km line from the border to the existing Kunene substation. NamPower, the vertically integrated utility in Namibia, intends financing its part of the transmission line through its own financial resources. |
Original sector | Energy and Mineral Resources,Social Sustainability and Inclusion |
Location
Country | Angola |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Power Transmission, Wind, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Angola
- Bailundo Solar Plant
- Sub-Saharan Africa's Largest Off-Grid Solar-Plus-Storage Park in Angola
- Solar-Powered Electricity Distribution Programme in Angola
- 50 MW solar PV project in Caraculo
- Cazombo Photovoltaic Park Off-Grid Hybrid Power Plant
- N'dola Sul Project
- Largest Solar Power Project in Sub-Saharan Africa
- VISTA ADVENT CITY