The proposed project aims finance Angola’s investment obligations towards the Angola-Namibia (ANNA) interconnection project which will create the transmission capacity needed in Angola to integrate with SAPP. It is part of Phase 2 of the Regional Energy Transmission, Trade and Decarbonization Project multiphase programmatic approach (RETRADE MPA). The ANNA transmission project consists of approxim

Project Information FAQ

Project Information

4 Q
The project “Huila-Cunene Interconnection Project” is an infrastructure initiative in the Solar sector, located in Angola. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project aims finance Angola’s investment obligations towards the Angola-Namibia (ANNA) interconnection project which will create the transmission capacity needed in Angola to integrate with SAPP. It is part of Phase 2 of the Regional Energy Transmission, Trade and Decarbonization Project multiphase programmatic approach (RETRADE MPA). The ANNA transmission project consists of approximately 366 km of 400 kV transmission line, of which 321 km is in Angola. The estimated costs for the proposed project in Angola is US$470 million, with an IBRD contribution of US$350 million and private sector financing of US$115 million. Two transmission lines will be financed under the proposed project through a mix of public and private financing, namely: the Lubango-Cahama-Namibian Border (Cunene) (segments A-B-C in Figure 1); and the Cahama-Ondjiva (segment B-D), with a potential substation in Xangongo. The segments A-B-D will be financed through a public ownership model and will extend hydro-dominated electricity to the isolated southern provinces that still use diesel generators. This will reduce the cost of electricity, reduce emissions, and improve the reliability of the service. It will also support government programs to increase access to electricity and facilitate the deployment of solar PV plants in an area with abundant solar resources and the expansion of industries. Segment B-C will be developed under a privately financed transmission (PFT) model to integrate Angola into SAPP, facilitating the export of unused surplus electricity and generating revenue for the power sector.In Namibia, the scope of works includes the 45km line from the border to the existing Kunene substation. NamPower, the vertically integrated utility in Namibia, intends financing its part of the transmission line through its own financial resources.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data