Humberhead Solar
The owner, status and timeline of this project. A free account opens every field.
Source: Hull Live
Humberhead Solar is a proposed 500MW solar farm covering four parcels of land about 3km southwest of Market Weighton and 1km southeast of Pocklington. The sites would be linked by underground cables to the National Grid Thornton Substation. The project has an operational life of 60 years, with a public consultation expected later in 2026 and application submission in 2027.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Raw Materials
- Location
- Market Weighton, East Riding of Yorkshire, United Kingdom
- Updated
- 19 Nov 2026
- Source
- Hull Live
ConstructChat
Ask ConstructChat about Humberhead Solar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Humberhead Solar is a proposed 500MW solar farm covering four parcels of land about 3km southwest of Market Weighton and 1km southeast of Pocklington. The sites would be linked by underground cables to the National Grid Thornton Substation. The project has an operational life of 60 years, with a public consultation expected later in 2026 and application submission in 2027. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
State | East Riding of Yorkshire |
City | Market Weighton |
Source
Source | Hull Live |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Raw Materials |
Article published date | 2026-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
