Humboldt Housing Rehabilitation Program
Sector: Commercial • Location: Eureka, California, United States of America
Source: Dodge
PRIMARY RESIDENCE 1. Secure permits, plans and specifications required to conduct work. 2. Remove and replace solar panels after new roofing is installed. 3. Replace gutters with new 5 gutters and down spouts. 4. Remove roofing and replace with new comp roofing. 5. Install one new flat glass clear skylight. 6. Install new insulation where missing in ceiling. 7. Install new drywall on ceiling in fr
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Residential, Solar, Government
- Location
- Eureka, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Humboldt Housing Rehabilitation Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PRIMARY RESIDENCE 1. Secure permits, plans and specifications required to conduct work. 2. Remove and replace solar panels after new roofing is installed. 3. Replace gutters with new 5 gutters and down spouts. 4. Remove roofing and replace with new comp roofing. 5. Install one new flat glass clear skylight. 6. Install new insulation where missing in ceiling. 7. Install new drywall on ceiling in front room and bathroom, texture to match existing. 8. Repair drywall damage in hallway, texture to... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Eureka |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Residential, Solar, Government |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
