Hunter Transmission Project
The owner, status and timeline of this project. A free account opens every field.
Source: T&D World
The Hunter Transmission Project involves building an above-ground 500 kV transmission line of around 100 km between Bayswater in the Upper Hunter and Olney in the Lower Hunter. This project aims to connect existing 500 kV transmission lines operated by Transgrid, enhancing energy security in New South Wales by facilitating the transport of electricity from renewable energy zones to consumers.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- T&D World
ConstructChat
Ask ConstructChat about Hunter Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Hunter Transmission Project involves building an above-ground 500 kV transmission line of around 100 km between Bayswater in the Upper Hunter and Olney in the Lower Hunter. This project aims to connect existing 500 kV transmission lines operated by Transgrid, enhancing energy security in New South Wales by facilitating the transport of electricity from renewable energy zones to consumers. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
Source
Source | T&D World |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
