Hunter Valley Hydrogen Hub Electrolyzer Project
Sector: Power Generation (CCGT) • Location: Australia
Source: TechStock²
Orica Ltd. has placed a 50-megawatt proton-exchange-membrane (PEM) electrolyzer order for its Hunter Valley Hydrogen Hub in Australia. The project aims to split water to produce hydrogen, with construction expected to start in 2026 and first hydrogen production set for early 2029. The project has reached its final investment decision, indicating the sponsor is moving forward.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Water Supply and Storage, Hydrogen
- Location
- Australia
- Updated
- 22 Jul 2026
- Source
- TechStock²
ConstructChat
Ask ConstructChat about Hunter Valley Hydrogen Hub Electrolyzer Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Orica Ltd. has placed a 50-megawatt proton-exchange-membrane (PEM) electrolyzer order for its Hunter Valley Hydrogen Hub in Australia. The project aims to split water to produce hydrogen, with construction expected to start in 2026 and first hydrogen production set for early 2029. The project has reached its final investment decision, indicating the sponsor is moving forward. |
Original sector | Renewable Energy |
Budget |
Location
Country | Australia |
Source
Source | TechStock² |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Water Supply and Storage, Hydrogen |
Article published date | 2026-07-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
