Hunter Valley Hydrogen Hub
One of 5,618 projects Taiyo tracks in New South Wales.
Source: ALCHEMPro
A 50-megawatt electrolysis facility to be constructed next to Orica's existing Kooragang Island ammonia and ammonium nitrate operation near Newcastle, Australia. The hub will generate close to 4,700 tons of hydrogen annually, covering roughly 7.5% of the site's gas feedstock needs, enabling production of around 26,600 tons per year of lower-carbon ammonia. Groundwork begins in 2026 with production
- Status
- Prospective
- Sector
- Power Generation (CCGT), Hydrogen
- Location
- Newcastle, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- ALCHEMPro
ConstructChat
Ask ConstructChat about Hunter Valley Hydrogen Hub
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 50-megawatt electrolysis facility to be constructed next to Orica's existing Kooragang Island ammonia and ammonium nitrate operation near Newcastle, Australia. The hub will generate close to 4,700 tons of hydrogen annually, covering roughly 7.5% of the site's gas feedstock needs, enabling production of around 26,600 tons per year of lower-carbon ammonia. Groundwork begins in 2026 with production targeted for early 2029. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | New South Wales |
City | Newcastle |
Source
Source | ALCHEMPro |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydrogen |
Article published date | 2026-07-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
