Hunters Green Drive Reconstruction Phase 2
Sector: Water Supply and Storage • Location: Independence, Kentucky, United States of America
Source: Dodge USA
Reconstruction of the pavement and sidewalks along Hunters Green Drive between approximately Flintlock Court and Arrow Court. Project will include the removal of the existing pavement, reconstruction with either concrete or asphalt pavement, the replacement of all sidewalks and driveway aprons, and minor upgrades to the storm sewer system. Project will be bid with a base bid for concrete pavement
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
- Location
- Independence, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hunters Green Drive Reconstruction Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconstruction of the pavement and sidewalks along Hunters Green Drive between approximately Flintlock Court and Arrow Court. Project will include the removal of the existing pavement, reconstruction with either concrete or asphalt pavement, the replacement of all sidewalks and driveway aprons, and minor upgrades to the storm sewer system. Project will be bid with a base bid for concrete pavement and an alternate for asphalt pavement. Prospective bidders may bid on either option or both. The ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Independence |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
