logo

Huntington Cleveland Salinity Reduction Project

Sector: Commercial • Location: United States of America

Source: Grants.gov

Project
Archived

This is a Notice of Intent to Award to Huntington Cleveland Irrigation Company.

Reclamation awarded agreement 04-FC-40-2242 in 2004 to Huntington Cleveland Irrigation Company (HCIC) to replace approximately 350 miles of existing earthen canals and laterals with a pressurized pipeline distribution system in the Northern Emery County in and around the towns of Huntington, Lawrence, Cleveland, a

Project Information FAQ

Project Information

5 Q
The project “Huntington Cleveland Salinity Reduction Project” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This is a Notice of Intent to Award to Huntington Cleveland Irrigation Company. Reclamation awarded agreement 04-FC-40-2242 in 2004 to Huntington Cleveland Irrigation Company (HCIC) to replace approximately 350 miles of existing earthen canals and laterals with a pressurized pipeline distribution system in the Northern Emery County in and around the towns of Huntington, Lawrence, Cleveland, and Elmo, Utah. This project, when fully completed, will reduce the salt loading to the Colorado River system by 59,000 tons annually. Due to unforeseen events and weather conditions the duration of the project has extended beyond what was originally envisioned. As a result Reclamation is issuing a follow-on agreement to complete the remaining unfinished work associated with the original agreement 04-FC-40-2242. Although the project is substantially complete, Reclamation is committed to help fund the approximate last 5% of the project. The anticipated completion date for this project is March 2014. If the project is not completed the anticipated salt load reductions to the Colorado River System will not be realized and the completed portions of the pressurized distribution system will not operate as designed. As a result many individual users in the project area will not have working “on-farm” salinity control measures. HCIC has already completed the designs, engineering, and planning required for the project. In addition, HCIC represents the land owners within the project area, and is the manager and operator of the distribution system, providing it unique access and knowledge of the project areas and requirements necessary for the successful completion of the distribution system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data